Safety: how is the plant isolated, and what do you do in a fire?

A solar plant has isolation points like any electrical installation; the difference is that its panels produce electricity whenever there is light on them. Here you see where the isolation points are, what each one disconnects, and what your staff and the fire service need to know.

By the engineering team at pv.directLast updated: 21 November 2026

The one fact that sets a solar plant apart.

The panels produce direct current. It runs through the cables to the inverter, which turns it into alternating current like that of the grid and your site.

One panel has a voltage of roughly 40 to 55 volts. But the panels are connected one after another in strings, so the voltage adds up: a string reaches several hundred volts, in commercial plants about 1,000 volts, and in some designs more.

And as long as there is light on the panels, there is voltage on them and on their cables as far as the DC isolating switch, even when the inverter is off and the main breaker is open. The sun has no switch.

This is no cause for concern: a plant that is well designed, well installed and inspected regularly is like the other electrical installations at your site. What matters is that the people on site know this fact.

Direct and alternating current in the glossary

From the panels to the grid, in one drawing.

The gold part of the drawing is what stays live in daylight, whatever you switch off after it.

123456
Illustrative drawingA simplified plant with one inverter; the number of inverters and switches, and where they sit, differ from one plant to another.
  1. The panels on the roof. The source of the direct current. As long as there is light on them, they carry voltage.
  2. The DC cables. They connect the panels to the inverter and stay live in daylight as far as the isolating switch.
  3. The DC isolating switch. It disconnects the inverter from the panels. It is usually part of the inverter, and sometimes in a box of its own.
  4. The inverter. It turns direct current into alternating current, and stops by itself when the grid goes down.
  5. The AC breaker. It disconnects the plant from your site's electrical system.
  6. The main distribution board, the meter and the grid. Here the plant is connected to your site's electrical system; beyond it come the meter and the distribution company's grid.

What each isolation point disconnects.

After isolating: what stays live in daylight.
Isolation pointDisconnectsStays live
DC isolating switchThe inverter from the panelsThe panels and their cables as far as the switch, and the inverter on its grid side
AC breakerThe plant from the site's electrical systemThe panels and their cables as far as the inverter, and the site's supply from the grid
The site's main breakerThe whole site from the gridThe panels and their cables as far as the inverter, the grid line as far as the breaker, and the site's supply if a standby generator starts

So no switch takes the voltage off the panels themselves, and any work on them or on their cables is for a qualified technician only.

A grid-connected inverter stops by itself as soon as the grid goes down, so that the plant does not feed disconnected lines that someone may be working on. The plant therefore does not replace a standby generator. A standby generator is no obstacle: we build plants for sites that have one. Write it in the notes of your project file, so that the design takes it into account.

Grid-connected plants

Why direct current needs care.

Alternating current passes through zero 100 times a second, which gives any spark the chance to go out by itself. Direct current never passes through zero, so a spark at a loose connection or a damaged cable can keep going for as long as the sun is up. Engineers call it an electric arc, and it is hot enough to start a fire.

What prevents it is, above all, the quality of the installation. Accepted good practice:

  • Cable connectors of the same make and type on both sides. Joining two halves of different makes, even when they look alike, is a known cause of overheating.
  • Connectors crimped with the tool made for them and pushed in until they lock.
  • Cables fixed in place, and protected from sharp edges and from direct sun.
  • Every connector tight, and none lying where water collects.

And things change over time: a connector heats up, a cable moves, insulation cracks. Periodic inspection helps to find this early, before it gets worse.

Cleaning and periodic inspection

Prevention and preparedness: what to ask about before you sign.

These are things a good design considers:

  • Clear signs at the main distribution board and at the isolating switches, saying that there is a solar plant on the roof.
  • A simple plan showing where the panels, the cable routes and the isolating switches are, kept with the security guard or the safety officer so that it can be handed to the fire service.
  • Clear paths on the roof for movement and access.
  • Cable routes away from where flammable materials are stored.

If your site has requirements from Civil Protection, the authority that runs Egypt's fire service, write them in the notes of your project file, and ask how the layout of the panels and the paths will respect them.

With every plant we hand over these signs at the main distribution board and the isolating switches, and a simple plan of the plant for you to keep, so that it can be handed to the fire service. Your written offer sets out the plant's components, so ask before you sign where the isolating switches will be. The technical survey comes after the contract, at the start of the execution; there the team confirms the cable routes and the place of the inverter on site.

Technical site survey

If there is a fire or an emergency.

  1. Keep people away from the area. Nobody goes near the panels, the cables or the inverter, except the person authorised to switch off, and only if the way there is safe.
  2. Call the fire service (Civil Protection) on 180. Say at the start of the call that there is a solar plant on the roof.
  3. Switch off if you can reach the switches safely. Only the authorised person switches off: the AC breaker first, then the DC isolating switch, following the inverter manufacturer's instructions. If the switches are near fire or smoke, leave them and tell the firefighters that the plant has not been switched off. Switching off stops the inverter, but the panels and their cables stay live.
  4. Show the firefighters where the isolating switches are. Do so as soon as they arrive, and hand them the plant's plan if there is one.
  5. Do not touch a damaged panel or cable. Do not spray water on it either. Assume it is live, even after the fire is out, and even if the fire was at night: the voltage returns with the first light.
  6. Nobody goes onto the roof. Not to fight the fire and not to look at what happened, until the fire service and a qualified technician confirm that the place is safe.
180 is the Civil Protection number given on the website of Egypt's Ministry of Interior. Write it beside the main distribution board, with the number of your safety officer and of whoever is responsible for maintaining the plant.

Ministry of Interior: public service numbers (in Arabic)

On a normal day.

  • Decide who is authorised to reach the isolating switches and to switch off in an emergency, and show them where each switch is, what it disconnects and the order of switching.
  • Nobody opens the cable connectors, the junction boxes or the inverter except a qualified technician. Opening a DC connector while the plant is running causes a spark.
  • Any other work on the roof, such as air conditioning or waterproofing, is done with the knowledge of the person responsible for the plant, so that the cables are not damaged.
  • If you smell burning, or find a connector or a box that has changed colour, touch nothing and tell whoever is responsible for maintenance at once. If there is smoke or fire, follow the emergency steps.

The scope of maintenance is set out in the offer and the contract. Ask about it before you sign.

Your request's pathShort questions, A price on the screen, A written offer within one working day, The contract, Survey and installation

Your project file starts with your first answer.

Tell us a few details about your site; our team reviews them and prepares a preliminary study for you.

Start designing your plantTalk to an engineer