Before you compare: the same basis.
Two offers built on different bases cannot be compared by price. First make sure every offer is built on:
- The same roof and the same available area.
- The same consumption: send every company the same bills.
- The same panel capacity in kilowatt-peak (kWp). If the capacities differ, ask each company for an offer at the same capacity.
- And with it, the inverter's capacity in kilowatts of alternating current (AC).
The inverter's capacity is the most the plant can deliver to your site at any one moment, and it is normal for the panels' capacity to be slightly higher. What matters is that you have both figures in writing.
Six fields in any offer.
Look for these six fields in every offer. A missing field is a question to ask before you compare.
- The plant's capacity. The panels' capacity in kilowatt-peak (kWp), with the inverter's capacity beside it.
- The expected yearly production. In kilowatt-hours (kWh), with the basis of the figure.
- The components. Panels, inverter, mounting structure, cables and protection devices, by manufacturer and model.
- The warranties. How long each warranty runs, and who answers for it.
- The scope of work. What the offer includes and what it does not, and who prepares the technical file for the grid connection.
- The price basis and the payment schedule. What the price covers, and which stage each payment is tied to.
Expected production: where does the figure come from?
The same capacity on the same roof produces about the same energy in a year. A small difference between offers is normal, because each design has its own tilt and its own assumptions about losses. A large difference needs an explanation.
Ask each company how many kilowatt-hours per kilowatt-peak a year its offer assumes, and whether the figure is calculated for your site and roof or is a general one. Ask, too, whether it is the first year's production, because panels produce slightly less every year. A higher figure in an offer does not mean a more suitable plant.
Components: by make and model.
Ask for every component in writing, by manufacturer and model, so that you can compare item by item:
- Panels and inverter: ask for the datasheet of each model.
- The number of panels multiplied by each panel's rating must equal the plant's capacity. Example: 200 panels of 550 W make 110 kWp.
- Mounting structure: its material, aluminium or galvanised steel, and how it is fixed to the roof.
- Cables and protection devices: each item with its type and quantity, not under the word “accessories”.
The net-metering rules issued by the Egyptian Electric Utility and Consumer Protection Regulatory Agency (EgyptERA) in February 2026 require local content of no less than 25% of the project's total components. The share is calculated on the value of all the project's items, design and installation work among them, not on the equipment alone. The New and Renewable Energy Authority approves it before installation, so ask each company how its offer meets it.
Warranties: who stands behind each one.
Panels carry two manufacturer warranties, each with its own terms: the product warranty against manufacturing defects, and the performance warranty, a minimum for the panel's output over the years. The inverter has a manufacturer warranty of its own. The warranty on the installation work is the installer's, and the contract sets it out.
For each warranty ask how long it runs, what it excludes, and whom you call in Egypt if something fails. The net-metering rules provide that the qualified installer gives you an approved warranty certificate for the main components, naming the guarantor or the authorised importer and the official means of reaching them; ask for it.
Ask about maintenance after the installer's warranty ends, too: the same rules oblige the owner of a plant of 100 kW AC or more to sign a maintenance contract with a company qualified by the New and Renewable Energy Authority, and the owner of a smaller plant to sign a contract for remote follow-up of its performance.
At pv.direct: equipment warranties come from the manufacturers on their terms; the installation work and maintenance are the responsibility of our Egyptian company, as the contract sets out.
Scope of work and price.
Under the net-metering rules, preparing the technical file for the grid connection and submitting it to the distribution company is the qualified installer's task. Make sure the offer says so, and ask who follows up the procedure after submission. Ask, too, whether the installer is qualified by the New and Renewable Energy Authority for your plant's capacity.
Make sure the company named on the offer is the one that will sign the contract with you.
Then compare the totals for the same scope. Ask each company what its price does not include, such as:
- Civil works, and any repair or strengthening of the roof.
- Changes to your site's main distribution board.
- The distribution company's fees: the study of the technical file and the measurements, and the bidirectional meter.
- The study of the plant's impact on the grid, for a connection to the medium-voltage network.
An offer that leaves items out does not really have a lower price. Ask whether the price is final, and what could change it. Compare the payment schedule as well: which stage each payment is tied to, from supply to installation to commissioning.
If an offer shows financial projections, ask which production and which electricity prices they assume, and how they count the surplus. With net metering, the surplus is credited as energy under the distribution company's rules.
Your questions for every offer.
| Item | What to ask | Why it matters |
|---|---|---|
| Capacity | How many kWp of panels, and how many kilowatts of inverter? | So that you compare plants of the same size. |
| Production | How many kWh per kWp a year, and where does the figure come from? | Every projection that follows rests on it. |
| Components | The manufacturer, the model and the datasheet of each item? | So that you know exactly what you will receive. |
| Warranties | How long is each warranty, what does it exclude, and whom do you call in Egypt? | The manufacturer's warranty is not the installer's. |
| Qualification | Does the company's qualification tier cover your plant's capacity? | The distribution company checks that the installer is qualified. |
| Connection file | Are preparing it and following it up written in the offer, and are the distribution company's fees in the price? | Approval is the distribution company's decision, and it is not automatic. |
| Scope | What is not included in the price? | So that you compare totals for the same scope. |
| Payment | Which stage is each payment tied to? | So that payment keeps pace with the work. |
An offer that answers these questions clearly deserves to be compared, whichever company wrote it. If you would like to know what our written offer holds:
Related pages.
- Credentials and qualificationsEach certificate: whose it is and what it covers.
- Grid and approvalsHow your plant connects to the grid, and who approves it.
- How to read a commercial electricity billWhere the figures on your bill are, and how they become a plant's capacity.
- Roof readiness for a solar plantWhat to check on your roof before the design, and what to prepare for your project file.
- Cleaning and periodic inspectionWhen and how to clean the panels, what your staff may do and what is left to the technician.