For factories, warehouses, commercial buildings and farms in Egypt
Design your solar plant and watch your project file take shape.
Three taps about your site, then we continue with the remaining short questions, with ready-made choices.
- Facility
- —
- Where it goes
- —
- Bill · EGP
- —
02 / Film
See how we work, in the founder's own voice.
03 / How we work
Three steps, and the decision is yours.
- 01
Answer a few short questions
You start designing your plant yourself in minutes; we save time and costs and pass them on to you.
- 02
Follow your project file
The drawing and the cells fill with your answers, and you can change any cell at any time.
- 03
Ask for your personal offer
When the questions are complete you choose how we contact you, with no obligation.
04 / Why us
Details we check with you, so you pay only for what you need
In many projects, costs are added that the project does not really need, often because of small design details. We check these details with you from the start, so you pay only for what your project needs, at the same quality.
- A plant sized to your actual consumption, neither larger nor smaller.
- An inverter that suits the panel capacity and the kind of load.
- A mounting structure that suits your roof and its loads.
- Short cable routes that keep the plant's output.
- TÜV Rheinland
- Certified specialist consultant for PV and storage technology
- Sherif Mohamed
- Has worked in solar since 2021
- LEIT Smart Solutions GmbH
- Leipzig, HRB 43344
05 / Common questions
Before you decide.
Who handles planning and installation?
LEIT's engineering team handles the scope of work agreed in the offer and the contract, once the required approvals are in place.
What does the warranty cover?
Manufacturer warranties, the offer and the contract define it: the period, the exclusions and who is responsible for maintenance. Ask for the details before signing.
Does production stop during installation?
Installation is planned in phases to keep downtime low; the schedule and any shutdowns are agreed with you before work starts.
Is the grid connection approval automatic?
Approval is not automatic; it is the distribution company's decision after the inspection. Calculations are estimates, not guarantees, and are reviewed after the inspection.
How do you avoid unnecessary costs?
We check the design details with you from the start: a plant sized to your actual consumption, an inverter that suits the panel capacity and the kind of load, a mounting structure that suits your roof and its loads, and short cable routes. So you pay only for what your project needs, at the same quality.
Your project file starts with your first answer.
Answer short questions about your site and watch your project file take shape.
Start designing your plantContinue with an engineer