A brand of LEIT

Your project file: your site's details in one place.

After your answers your site has a file with our team, and you receive a link to complete it whenever it suits you.

You receive
a link to your project file, where you can add the location, a photo of the bill and photos of the roof if you wish.
Who decides
You decide what to add and when.

What the file holds.

  • The kind of site.
  • The panel place: a metal or concrete roof, or ground beside the building.
  • Operating hours, for factories and warehouses.
  • The electricity bill, or its band.
  • The city, and the location on the map if you wish to add it.
  • A photo of the bill and photos of the roof, if you wish.
A–AYour plant, drawn from your answersIllustrative drawing

Why we ask.

  • The kind of site and its operating hours show when you use electricity during the day.
  • The panel place decides the mounting and the area available.
  • The bill shows your consumption, from which the right plant size is worked out.
  • The city and the location help us arrange the survey.

All the steps

Your project file starts with your first answer.

Tell us a few details about your site; our team reviews them and prepares a preliminary study for you.

Start designing your plantTalk to an engineer