ENGINEERING & INSTALLATION • CUSTOMER GUIDE
Gold installer qualification
شركة لايت لاستشارات الطاقة النظيفة
- Capacity-appropriate qualifications
- Clear scope and specifications
- Testing and handover records
Attention to detail. From the first fixing to the final test.
QUALITY AT EVERY STAGE
More than panels on a roof.
Use these checkpoints to discuss the technical proposal and installation scope. Final details follow the survey and design and should be recorded in your contract.
- 01
A proper site survey
Review consumption, meter data, space, shading, roof condition, access and cable routes, including any need for structural assessment.
- 02
A design you can review
Panel layout, inverter selection, electrical diagrams and suitable protection. Distinguish DC module capacity, AC inverter capacity and approved grid-connection capacity.
- 03
Clearly specified components
Record brands, models and ratings; review datasheets, certificates and warranties. Agree any substitution in writing before installation.
- 04
Installation & site safety
Roof-appropriate mounting, waterproofing protection, cable management, earthing and labelling, with a safety plan for electrical work and work at height.
- 05
Checks before handover
Document electrical checks, protection settings and commissioning according to the design and relevant requirements; record results and resolve outstanding issues.
- 06
Clear operation & maintenance
User training, monitoring where included, a named support contact, maintenance scope, warranty terms and agreed response times.
VERIFY THE QUALIFICATION
The right capacity. The right tier.
LEIT Energy Consulting holds Gold installer qualification. Under NREA's classification, the Gold tier covers capacities up to 3 MW. Here is how the four tiers compare.
01
Bronze
50 kW
Up to 50 kW
02
Silver
500 kW
Up to 500 kW
Our qualification
Gold
3 MW
Up to 3 MW
04
Platinum
> 3 MW
Above 3 MW, within the published rules up to 20 MW
Tier limits follow NREA's update of 6 January 2025. The Gold certificate holder is شركة لايت لاستشارات الطاقة النظيفة (LEIT Energy Consulting). Review the project against the certificate and technical documents and obtain its site-specific grid approvals.
NREA requirements & company listsEgypt's official PV Hub platform
FROM SURVEY TO OPERATION
Clear stages. Clear responsibilities.
We organise the scope of LEIT's team, the customer and relevant authorities in the project file. Timelines and required approvals depend on the site and system type.
- 01
Assessment & site survey
Consumption, meter and site information; technical opportunities and constraints.
- 02
Design & detailed proposal
Components, scope, cost and payment schedule, with assumptions and exclusions.
- 03
Technical file & approvals
For on-grid projects: qualification, documents and distribution-company requirements before work requiring approval.
- 04
Supply & installation
Check delivered equipment, implement the approved design and document changes.
- 05
Testing & commissioning
Operational and protection checks; complete grid inspection, connection and metering as required.
- 06
Handover & aftercare
Handover records, documents, warranties, training and agreed aftercare.
YOUR PRACTICAL CHECKLIST
Know what to ask before you sign.
Before signing
- Legal company name and valid qualification certificate and scope.
- Proposal listing components, models, DC/AC ratings and work scope.
- Responsibility for structural work, waterproofing, approvals and metering; what the price includes.
- Milestone-based payments, warranty and maintenance terms and exclusions.
At handover
- As-built drawings, equipment data and serial numbers.
- Test results, commissioning records and relevant approvals.
- Warranties, operation and maintenance instructions and user training.
- Agreed monitoring access, outstanding-issue list and support contact.
Three things to keep distinct
- Equipment warrantyManufacturer's terms, duration and claim process; these vary by component.
- Workmanship warrantyThe installer's responsibility for its work, with written scope, duration and procedures.
- Maintenance serviceVisits, cleaning, monitoring and repairs as agreed; confirm what is included and what is chargeable.
FAQs
Answers for an informed decision.
How do I verify an installer's qualification?
Request a current certificate in the executing company's name. Check its tier, capacity scope and details against NREA and PV Hub official sources. Advertising or a training badge is not proof of installer qualification.
What is LEIT's qualification tier and scope?
شركة لايت لاستشارات الطاقة النظيفة (LEIT Energy Consulting) holds Gold qualification. NREA's Gold tier covers capacities up to 3 MW. Each project is reviewed against the certificate scope and technical requirements; grid approval remains project-specific.
Does qualification replace grid approval?
No. Qualification concerns the installer; grid approval concerns the specific site, plant and technical file. Check the project's distribution-company and PV Hub requirements.
Is calculator capacity the approved capacity?
The calculator is an estimate. DC module capacity, AC inverter capacity and grid-connection capacity are not necessarily identical; confirm them in the design, documents and approval.
What should I prepare for the survey?
Site address, recent electricity bills, meter details, roof photos and ownership or use-right documents where available. For factories, operating hours, loads and access routes also matter.
How long does installation take?
It depends on size, site condition, equipment availability and approvals. Ask for a schedule separating design, supply and installation from authority-review periods, with responsibilities for each stage.
Will solar operate during a power cut?
Do not assume backup power from a grid-connected system. Backup requires a suitable design and equipment, potentially including a battery, compatible inverter and dedicated load circuits. Discuss it before choosing the system.
How do I get support after handover?
Keep handover records, warranties and serial numbers. Agree a support contact and reporting procedure in the contract. Record the fault, time and inverter messages and follow safety instructions before any intervention.