Great solar starts with installation you can trust.

The right qualifications, a design that fits your site, and documented checks before handover. Know what to look for in an installer and how we help organise your project from survey to operation.

ENGINEERING & INSTALLATION • CUSTOMER GUIDE

Gold installer qualification

شركة لايت لاستشارات الطاقة النظيفة

Explore the qualification scope up to 3 MW

  • Capacity-appropriate qualifications
  • Clear scope and specifications
  • Testing and handover records

Attention to detail. From the first fixing to the final test.

QUALITY AT EVERY STAGE

More than panels on a roof.

Use these checkpoints to discuss the technical proposal and installation scope. Final details follow the survey and design and should be recorded in your contract.

  1. 01

    A proper site survey

    Review consumption, meter data, space, shading, roof condition, access and cable routes, including any need for structural assessment.

  2. 02

    A design you can review

    Panel layout, inverter selection, electrical diagrams and suitable protection. Distinguish DC module capacity, AC inverter capacity and approved grid-connection capacity.

  3. 03

    Clearly specified components

    Record brands, models and ratings; review datasheets, certificates and warranties. Agree any substitution in writing before installation.

  4. 04

    Installation & site safety

    Roof-appropriate mounting, waterproofing protection, cable management, earthing and labelling, with a safety plan for electrical work and work at height.

  5. 05

    Checks before handover

    Document electrical checks, protection settings and commissioning according to the design and relevant requirements; record results and resolve outstanding issues.

  6. 06

    Clear operation & maintenance

    User training, monitoring where included, a named support contact, maintenance scope, warranty terms and agreed response times.

VERIFY THE QUALIFICATION

The right capacity. The right tier.

LEIT Energy Consulting holds Gold installer qualification. Under NREA's classification, the Gold tier covers capacities up to 3 MW. Here is how the four tiers compare.

  • 01

    Bronze

    50 kW

    Up to 50 kW

  • 02

    Silver

    500 kW

    Up to 500 kW

  • Our qualification

    Gold

    3 MW

    Up to 3 MW

  • 04

    Platinum

    > 3 MW

    Above 3 MW, within the published rules up to 20 MW

Tier limits follow NREA's update of 6 January 2025. The Gold certificate holder is شركة لايت لاستشارات الطاقة النظيفة (LEIT Energy Consulting). Review the project against the certificate and technical documents and obtain its site-specific grid approvals.

FROM SURVEY TO OPERATION

Clear stages. Clear responsibilities.

We organise the scope of LEIT's team, the customer and relevant authorities in the project file. Timelines and required approvals depend on the site and system type.

Installer qualification and project approval are separate. pv.direct is a private business; official approvals and grid requirements remain with the relevant Egyptian authorities.
  1. 01

    Assessment & site survey

    Consumption, meter and site information; technical opportunities and constraints.

  2. 02

    Design & detailed proposal

    Components, scope, cost and payment schedule, with assumptions and exclusions.

  3. 03

    Technical file & approvals

    For on-grid projects: qualification, documents and distribution-company requirements before work requiring approval.

  4. 04

    Supply & installation

    Check delivered equipment, implement the approved design and document changes.

  5. 05

    Testing & commissioning

    Operational and protection checks; complete grid inspection, connection and metering as required.

  6. 06

    Handover & aftercare

    Handover records, documents, warranties, training and agreed aftercare.

YOUR PRACTICAL CHECKLIST

Know what to ask before you sign.

Before signing

  • Legal company name and valid qualification certificate and scope.
  • Proposal listing components, models, DC/AC ratings and work scope.
  • Responsibility for structural work, waterproofing, approvals and metering; what the price includes.
  • Milestone-based payments, warranty and maintenance terms and exclusions.

At handover

  • As-built drawings, equipment data and serial numbers.
  • Test results, commissioning records and relevant approvals.
  • Warranties, operation and maintenance instructions and user training.
  • Agreed monitoring access, outstanding-issue list and support contact.

Three things to keep distinct

  • Equipment warrantyManufacturer's terms, duration and claim process; these vary by component.
  • Workmanship warrantyThe installer's responsibility for its work, with written scope, duration and procedures.
  • Maintenance serviceVisits, cleaning, monitoring and repairs as agreed; confirm what is included and what is chargeable.

FAQs

Answers for an informed decision.

How do I verify an installer's qualification?

Request a current certificate in the executing company's name. Check its tier, capacity scope and details against NREA and PV Hub official sources. Advertising or a training badge is not proof of installer qualification.

What is LEIT's qualification tier and scope?

شركة لايت لاستشارات الطاقة النظيفة (LEIT Energy Consulting) holds Gold qualification. NREA's Gold tier covers capacities up to 3 MW. Each project is reviewed against the certificate scope and technical requirements; grid approval remains project-specific.

Does qualification replace grid approval?

No. Qualification concerns the installer; grid approval concerns the specific site, plant and technical file. Check the project's distribution-company and PV Hub requirements.

Is calculator capacity the approved capacity?

The calculator is an estimate. DC module capacity, AC inverter capacity and grid-connection capacity are not necessarily identical; confirm them in the design, documents and approval.

What should I prepare for the survey?

Site address, recent electricity bills, meter details, roof photos and ownership or use-right documents where available. For factories, operating hours, loads and access routes also matter.

How long does installation take?

It depends on size, site condition, equipment availability and approvals. Ask for a schedule separating design, supply and installation from authority-review periods, with responsibilities for each stage.

Will solar operate during a power cut?

Do not assume backup power from a grid-connected system. Backup requires a suitable design and equipment, potentially including a battery, compatible inverter and dedicated load circuits. Discuss it before choosing the system.

How do I get support after handover?

Keep handover records, warranties and serial numbers. Agree a support contact and reporting procedure in the contract. Record the fault, time and inverter messages and follow safety instructions before any intervention.

Approvals are a step inside your project, and we explain them.

Start by designing your plant; we set out the connection steps in your offer and in the consultation.

Start designing your plantContinue with an engineer