For factories
A solar plant designed around your factory's consumption
We start from the electricity bill, the operating hours and the condition of the roof, then design your plant around what your factory needs.
- Facility
- Factory
- Where it goes
- —
- Bill · EGP
- —
Ready-made choices · no obligation
Continue with an engineer02 / What we need from you
Five inputs we size the plant from.
- The electricity bill
- The latest monthly bill of the site.
- Operating hours
- The number of shifts and the running hours of the production lines.
- Roof type and area
- Concrete, metal or adjacent ground, and an approximate area.
- Site location
- The governorate or the industrial zone.
- Grid connection
- The distribution company the site belongs to.
03 / How we work
From the first review to commissioning.
- 01
Initial review
We review your roof and consumption data, and explain whether a site visit is needed and any fees before we confirm them.
- 02
Design
Our engineering team designs the plant that suits your facility, from your inputs and the state of your site.
- 03
Technical file and approvals
We prepare the technical file and follow the procedures of the responsible distribution company; installation starts only after the required approval.
- 04
Installation and commissioning
We coordinate installation, inspection and commissioning after the required approvals, and explain the scope of work and its impact on your site.
- 05
Following operation
We explain how production is followed, and maintenance follows the contract.
04 / Before installation
Two things we agree with you in advance.
05 / Facts, not promises
Who stands behind your project
pv.direct is delivered in Egypt by our Egyptian company; LEIT Smart Solutions GmbH in Leipzig stands behind the brand.
- TÜV Rheinland
- Certified specialist consultant for PV and storage technology
- Sherif Mohamed
- Has worked in solar since 2021
- LEIT Smart Solutions GmbH
- Leipzig, HRB 43344
06 / Factory owners' questions
Before you decide.
Am I committing to anything?
No. The questions are ready-made choices, and you can stop whenever you like, with no obligation.
Who handles planning and installation?
LEIT's engineering team handles the scope of work agreed in the offer and the contract, once the required approvals are in place.
Who maintains the plant?
Monitoring and maintenance follow the contract, and the offer and the contract set each party's responsibilities.
What does the warranty cover?
Manufacturer warranties, the offer and the contract define it: the period, the exclusions and who is responsible for maintenance. Ask for the details before signing.
How do we review the design details with you?
From the start we review the plant size against your actual consumption, an inverter that suits the panels and the load, a mounting structure that suits your roof, and short cable routes.
Is the grid connection approval automatic?
Approval is not automatic; it is the distribution company's decision after the inspection. Calculations are estimates, not guarantees, and are reviewed after the inspection.
Start your factory's file with one answer.
The kind of site, the place of the panels, the bill: three answers draw your factory's plant.
Start designing your plantContinue with an engineer