The plant.
- Kilowatt peak kWp
The rated power of the panels under standard test conditions. A 100 kWp plant has panels with a combined rating of 100 kilowatts; your offer sizes the plant in kWp.
Capacity and production: kWp and kWh- Kilowatt-hour kWh
The unit of energy, the same unit as on your electricity bill: what your plant produces and what your site consumes.
Capacity and production: kWp and kWh- Yearly yield per kilowatt peak kWh/kWp
How many kWh each kWp produces in a year. It depends on the site, the tilt and orientation of the panels and shading, and turns the plant’s capacity into energy.
Capacity and production: kWp and kWh- Performance ratio PR
The energy the plant actually produces as a share of what it could produce from the same sunlight, after losses: heat, cables, the inverter and dust.
Cleaning and periodic inspection- Inverter
The device that turns the direct current from the panels into alternating current like that of the grid and your site.
- Direct and alternating current DC / AC
Panels produce direct current; the grid and your site’s equipment run on alternating current, so the inverter sits between them.
Safety: isolation and what to do in a fire- Mounting structure
The racks that hold the panels on the roof or on the ground and set their tilt and orientation.
Roof readiness for a solar plant- Tilt and orientation Tilt / azimuth
The panels’ angle from horizontal and the direction they face. Both affect the yield and are set by the roof and the site.
The area a plant needs- Shading
Any shadow on the panels from a building, a tank or trees. Shade on a small part can cost more energy than its size, so it is checked in the design and the survey.
Roof readiness for a solar plant
Grid and approvals.
- Grid-connected plant On-grid
A plant that works with the electricity grid, without batteries: the sun supplies your site first, and the rest comes from the grid.
Grid-connected plants- Net metering
The surplus your plant exports to the grid is credited as energy, kWh for kWh — never as money. Net metering is not electricity storage and not backup power: when the grid goes down, the plant stops.
Grid-connected plants- Bidirectional meter
A meter that measures the electricity your site draws from the grid and what your plant exports to it. The distribution company installs it after its inspection.
- Preliminary vs approved capacity Preliminary / approved capacity
The capacity in the calculator and the offer is preliminary until the technical file is reviewed and officially approved; the approved capacity may differ.
Grid-connected plants- Electricity distribution company Distribution company
Approves connecting the plant to the grid and installs the meter after its inspection.
The approval steps- NREA and PV Hub NREA / PV Hub
The official body that qualifies installation companies. pv.direct is not PV Hub and does not speak for it.
Grid and approvals- Qualification certificate Qualification
The New and Renewable Energy Authority’s grading of installation companies; each tier covers the capacities a company may build.
The Gold qualification
Your file and offer.
- Project file
The file your answers create for your site; our team reviews it before preparing your offer.
Your project file- Personal offer
The written offer for your site: the plant, its components, its yield and the payment. Our team reviews it before it reaches you, and it is not a contract.
Your personal offer
