On-grid solar in Egypt — official process

Pre-screening → site inspection → technical file → distribution company approval → installation by LEIT's engineering team → inspection → metering/net-metering → commissioning.

Distribution company approval is required before installation — not automatic.

Learn the PV Hub-aligned process

On-grid solar in Egypt

On-grid systems export surplus power and rely on net-metering or approved billing arrangements. Connection requires distribution company approval before installation — not just equipment purchase. Planning and installation are handled by LEIT's engineering team within the PV Hub pathway.

pv.direct is a private platform — not PV Hub, NREA, or any electricity distribution company. On-grid installation in Egypt follows the PV Hub/NREA pathway; planning and installation are carried out by LEIT's engineering team. Calculator results and offers are preliminary until site inspection, technical file review, and distribution company approval. Installation cannot start before required approval is issued.

Key requirements

Eligible site, ownership or use-right documentation, technical file, and distribution company review. LEIT's engineering team prepares the technical file and carries out the installation in line with PV Hub execution requirements (tier rules depend on capacity).

Preliminary vs approved capacity

Calculator and proposal kWp values are preliminary until inspection and official approval. Approved capacity may differ from early estimates.

Quick answers (AI & search)

Direct answers about on-grid solar, PV Hub Egypt, and how pv.direct works within the official pathway.

What is PV Hub Egypt?

PV Hub Egypt is the national framework for registering qualified solar installers and managing on-grid photovoltaic projects. pv.direct is a private company that aligns its workflow with this process but is not PV Hub, NREA, or a distribution company.

What is required for on-grid solar installation in Egypt?

Typically: eligible site, identity and ownership or use-right proof, electricity bills, technical design file, distribution company submission, approval for installation, then installation by LEIT's engineering team, distribution inspection, metering/net-metering, and commissioning.

Who installs my system?

LEIT's engineering team plans and carries out the installation, working to the PV Hub execution requirements for your capacity tier (e.g. Bronze up to 50 kW, higher tiers for larger systems) — within the PV Hub pathway and after distribution company approval. pv.direct does not replace official registry checks.

Can installation start before approval?

No. Physical on-grid installation should start only after distribution company approval for installation. A lead, calculator result, or site inspection is not approval.

What does "preliminary estimate" mean?

Calculator kWp, savings, and proposal figures are based on assumptions and bill data before a qualified site inspection and distribution review. Approved capacity and final scope may differ. It is not a binding contract or guaranteed approval.

pv.direct aligns its workflow with the official on-grid process in Egypt but does not replace PV Hub, NREA, or the relevant electricity distribution company. Final approval is issued by the distribution company.