A brand of LEIT

Capacity and production: what is the difference between kWp and kWh?

Two figures you meet in every offer. One says how big the plant is; the other says how much it produces in a year.

By the engineering team at pv.directLast updated: 20 November 2026

Capacity: kilowatt-peak.

Capacity is the combined rating of the panels under standard test conditions. A 100 kWp plant has panels rated at 100 kilowatts together. Capacity sets the size of the plant: the number of panels, the area and the inverter.

Production: kilowatt-hours.

Production is the energy the plant actually delivers over a period, in the same unit as your bill. It depends on the sun at your site, the tilt and orientation of the panels, shading, heat and dust.

From capacity to production.

We multiply the capacity by what one kilowatt-peak produces in a year. We calculate with 1,850 kWh per kWp a year, the figure our offer uses; the actual yield depends on the location and the roof. An example:

100 kWp1,850 kWh per kWp185,000 kWh a year

From area to capacity

Production over the year.

The summer sun is stronger, so the plant produces more from May to September and less in winter. This chart spreads the example's production over the months with the same shares as our written offer.

  1. January10,383 kWh
  2. February11,327 kWh
  3. March14,158 kWh
  4. April16,046 kWh
  5. May17,934 kWh
  6. June18,878 kWh
  7. July19,821 kWh
  8. August19,821 kWh
  9. September17,934 kWh
  10. October16,046 kWh
  11. November12,270 kWh
  12. December10,382 kWh
Production peaks in July and August, at about 19,821 kWh a month, and is lowest in December, at about 10,382 kWh.

And if production exceeds your use?

A grid-connected plant supplies your site first; what exceeds your use at any moment goes to the grid and is counted under net metering.

Net metering in the glossary

Your request's pathShort questions, A price on the screen, A written offer within one working day, The contract, Survey and installation

Your project file starts with your first answer.

Tell us a few details about your site; our team reviews them and prepares a preliminary study for you.

Start designing your plantTalk to an engineer