From capacity to area.
The area needed is the plant's capacity multiplied by the area one kilowatt-peak needs. The capacity itself comes from your consumption: from your bill, or from the plant calculator.
What one kilowatt-peak needs depends on where the panels go. We calculate with 6 square metres on a metal roof, 10 on concrete and 12 on the ground. These are the numbers our offer uses.
| Capacity | Metal roof | Concrete roof | Ground |
|---|---|---|---|
| 100 kWp | 600 | 1,000 | 1,200 |
| 250 kWp | 1,500 | 2,500 | 3,000 |
| 500 kWp | 3,000 | 5,000 | 6,000 |
| 1,000 kWp | 6,000 | 10,000 | 12,000 |
Where does the area go?
A panel takes the same area on any surface. The difference lies in what surrounds it: the walkways and the spacing between rows add to the area each kilowatt-peak needs, while the edges and the obstacles take area from the roof itself.
- The rows of panels. They produce the electricity. The closer the rows, the less area each kilowatt-peak needs.
- The spacing between tilted rows. Every tilted row casts a shadow behind it. This spacing keeps the shadow off the next row during the main sun hours.
- Maintenance walkways. A safe way to clean and inspect, without walking on the panels.
- The clear strip at the roof's edge. It stays clear so that people can move safely, because the wind forces on the panels are higher at the roof's edges and corners, and so that the parapet's shadow does not fall on the panels.
- Obstacles and their shade. Skylights, air-conditioning units and tanks. The space they take does not count, and neither does the space their shade falls on.
- The inverter and the cable route. The inverter belongs in a shaded, well-ventilated place that is easy to reach, and the cables need a route from the panels to it. Their place is confirmed on site in the technical survey, after the contract, at the start of the execution.
Why does the figure change from one surface to another?
- Metal roof: the panels lie parallel to the sheet, all in one plane and close together. No row shades another, so it usually needs the smallest area.
- Concrete roof: it is flat, so the panels stand tilted on the mounting structure. The rows are set apart so that no row shades the one behind it, above all in winter, when shadows are longer.
- Ground: the same tilted rows, but the mounting structures are usually larger and the spacing between them wider, with paths for access and maintenance.
The figure is not fixed even on the same kind of surface. A lower tilt means a shorter shadow and closer rows, so the roof carries more capacity, but each panel may produce a little less. A more efficient panel gives the same capacity from a smaller area.
Gross area and net area.
The area you get from the building's drawings or from a map is the gross area. Panels go only on the net area: what remains once you take off the edges, the skylights and equipment with their shade, and the access routes to that equipment, which have to stay open.
The area you worked out from the capacity already includes the maintenance walkways and the spacing between rows, so do not take them off your roof a second time. Compare it with the net area, not with the gross area.
Prepare for your project file:
- The roof's length and width.
- The approximate area of what stands on it: air-conditioning units, tanks and skylights.
- Photos of the roof from different corners, with the obstacles in view.
Your offer is built on what is in your file. The technical survey comes after the contract, at the start of the execution, and confirms the net area on site.
What decides the size of the plant?
- Consumption first. The plant is designed to fit your consumption, and the capacity that covers it is calculated from it.
- Then the area. If the net area is not enough for that capacity, or the roof's load capacity does not allow it, the capacity comes down to what the roof carries.
- Then the grid connection. It is the distribution company that approves connecting the plant, and the approved capacity may differ from the preliminary one.
If your roof is smaller than you need, the plant covers part of your consumption and the rest comes from the grid. And if you have open land beside the building, a ground structure is another option.
If your roof is larger than you need, the plant does not grow to fill it. The capacity is sized to your consumption, because the surplus is credited as energy under the distribution company's rules.
If you have not yet worked out the capacity that fits your consumption, start from your bill.
Questions to ask before you sign.
- Was the capacity in my offer set by my consumption or by the area?
- What is the net area on my roof, and what was taken off the gross area?
- At what tilt will the panels be installed, and with what spacing between the rows?
- Where are the walkways, the inverter and the cable route planned?
And if you have the area and want the capacity?
That is the same calculation in reverse. Enter the available area and the kind of surface, and the tool works out the approximate capacity that fits, the number of panels and the yearly energy.
Related pages.
- Roof readiness for a solar plantWhat to check on your roof before the design, and what to prepare for your project file.
- How to compare solar offersSix fields in every offer, and the questions to ask each company.
- Plant calculatorYour plant's capacity and yield from your bill.
- Capacity and production: kWp and kWhTwo figures in every offer: how big the plant is, and how much it produces.
- GlossaryThe words in your offer, in plain terms.